您好,歡迎訪問禹城泰瑞彩鋼復(fù)合板加工廠!

服務(wù)熱線

18765446878

熱門關(guān)鍵詞:禹城彩鋼廠,禹城彩鋼復(fù)合板,禹城鋼結(jié)構(gòu)板房 彩鋼板房
當(dāng)前位置:首頁>新聞資訊>新聞動態(tài)濟(jì)南彩鋼板房對于配置和環(huán)境有什么要求?

濟(jì)南彩鋼板房對于配置和環(huán)境有什么要求?

來源:http://www.fptdc.cn 日期:2020-10-08 發(fā)布人:
彩鋼活動房現(xiàn)在很常見了,雖然重量輕,但構(gòu)造全體性佳,抗震性佳,房子可多差拆裝,屢差運用率高。要注意的是,在彩鋼活動房對裝配地點和環(huán)境是有一定要要求的。
Color steel activity room is now very common, although light, but the structure of the whole good, earthquake resistance is good, the house can be disassembled and disassembled many times, the utilization rate is high. It should be noted that there are certain requirements for the assembly site and environment in the color steel activity room.
1.地基的硬度:在澆注底子前,要事前測量佳地基的硬度,如有地形特殊或地基硬度相次太大,務(wù)必作特殊處理,以確保板房能順利裝配和保障裝配后的質(zhì)量,如何特殊處理,與技能部溝通。
1. Hardness of foundation: before pouring the foundation, measure the hardness of the foundation before pouring. If there is special terrain or the hardness of foundation is too large, special treatment must be made to ensure the smooth assembly of the board house and ensure the quality after assembly. How to deal with special treatment, communicate with the skill department.
2.底子的程度:在底子澆注時,必定要測量佳程度,底子澆注完后,程度誤次操縱在10MM以內(nèi)。
2. The degree of the base: when pouring the base, it is necessary to measure the good degree. After the bottom pouring, the error degree is controlled within 10 mm.
3.混泥土標(biāo)號:大局部尺度板房底子為C20。平常情況下內(nèi)無鋼筋,如有地形、地基特殊情況或板房有特殊要求,應(yīng)以技能部出圖為準(zhǔn)。
3. Concrete label: C20 for the floor of large local scale slab house. Under normal circumstances, there is no reinforcement in it. If there are special conditions of terrain, foundation or slab house, the drawing of skill department shall prevail.
4.底子澆注時間:彩鋼活動房的底子澆注應(yīng)與慣例的混泥土澆注工藝一樣,不可減少工藝秩序。在底子澆注完成到板房裝配之間應(yīng)留有充沛時間,以確?;炷嗤恋竭_(dá)必定的硬度。

濟(jì)南彩鋼板房
The pouring process should not be the same as the pouring process of steel base. Sufficient time should be left between the bottom pouring and the panel room assembly to ensure that the concrete reaches a certain hardness.
5.要求:為保障裝配工期,裝配質(zhì)量和裝配后整潔美觀,在制造底子的同時,把室內(nèi)地面也一并澆注完成,程度高度與底子一樣,在板房裝配完成后,在室內(nèi)鋪地板既方便,又整潔,也不會影響板房的質(zhì)量和外觀。室內(nèi)地板的高度應(yīng)比底子程度高度高出50MM,以確保雨水不會流入室內(nèi)和地圈梁的堅實水平。
5. Requirements: in order to ensure the assembly time limit, assembly quality and neatness and beauty after assembly, the indoor floor shall be poured at the same time while the substrate is manufactured, and the degree is the same as that of the substrate. After the completion of the panel room assembly, it is convenient and tidy to lay the floor indoors, and the quality and appearance of the board room will not be affected. The height of the indoor floor should be 50 mm higher than the height of the bottom level to ensure that rainwater will not flow into the room and the solid level of the ground ring beam.
只有把裝配地點和環(huán)境的要求達(dá)到了,裝出來的彩鋼活動房才能堅固耐用,更好的保證使用。
Only when the requirements of assembly site and environment are met, the color steel movable room can be durable and safe.

聯(lián)系電話:18765446878

咨詢熱線:18765446878(微信同號)

地址:禹城市十里望鎮(zhèn)山東國際商貿(mào)港往南660米

備案號:魯ICP備2023024436號 魯公網(wǎng)安備37010202001695號 網(wǎng)站地圖|XML|TXT

微信二維碼

微信二維碼