1、活動(dòng)的原部件進(jìn)行改造房間的加固設(shè)計(jì),施工和承諾,力爭達(dá)到單位,施工單位根據(jù)確定的經(jīng)驗(yàn)和更合理的設(shè)計(jì)實(shí)施的彩鋼板房水平。
1. The original components of the activity shall be transformed into the reinforcement design, construction and commitment of the room, and strive to reach the level of color steel plate house implemented by the unit and the construction unit according to the determined experience and more reasonable design.
2、鋼筋混凝土結(jié)構(gòu)房屋使用年限,由業(yè)主和設(shè)計(jì)單位,一般為30年指定的同意。當(dāng)?shù)氐纳罱Y(jié)構(gòu)和結(jié)構(gòu)加固已使用和不超過50年的年數(shù),作為業(yè)主項(xiàng)目要求或特殊需要的結(jié)果,有一個(gè)較長的壽命,應(yīng)采取的措施旨在彩鋼板房加強(qiáng)如果有必要,專將召開會(huì)議,討論確定解決方案。原有的抗震設(shè)計(jì),低強(qiáng)度的或舊的混凝土房屋結(jié)構(gòu)的抗震設(shè)防標(biāo)準(zhǔn)設(shè)計(jì),加固彩鋼板房改造現(xiàn)有規(guī)范的大部分是難以達(dá)到設(shè)計(jì)要求。
2. The service life of reinforced concrete structure houses shall be agreed by the owner and the design unit, generally 30 years. The local living structure and structural reinforcement have been used for no more than 50 years. As a result of the owner's project requirements or special needs, it has a long service life. The measures to be taken are aimed at strengthening the color steel slab house. If necessary, experts will hold a meeting to discuss and determine the solution. The original seismic design, the seismic fortification standard design of low-strength or old concrete building structures, and the reconstruction of reinforced color steel plate houses are mostly difficult to meet the design requirements.
3、活動(dòng)房加固由有資格的設(shè)計(jì)單位或科研單位進(jìn)行加固改造彩鋼板房設(shè)計(jì)應(yīng)。
3. The reinforcement of movable houses shall be carried out by qualified design units or scientific research units. The design of color steel plate houses shall be.
4、鑒定和檢測修改鋼筋的施工圖設(shè)計(jì)文件,但也需要與新的建筑施工圖文件,發(fā)送文件審查施工圖審查部門,如果在一樓門面或大型臨時(shí)改造的主要街道上的原始屋頂,彩鋼板房設(shè)計(jì)中應(yīng)由當(dāng)?shù)匾?guī)劃部門批準(zhǔn)的設(shè)計(jì)文件,應(yīng)與新的工程設(shè)計(jì)存檔。
4. Identify and detect the construction drawing design documents of the modified reinforcement, but it is also necessary to send the documents to the construction drawing review department with the new construction drawing documents. If the original roof on the first floor facade or the main street of large-scale temporary reconstruction, the design documents approved by the local planning department in the design of color steel slab house shall be filed with the new engineering design.
The above wonderful content is what Xiaobian provides for you today. More wonderful content comes from: Jinan color steel plank house. For details, please click our website to pay attention to: http://www.fptdc.cn