活動板房的鋼骨架的安裝搭建事項

來源:http://www.fptdc.cn 日期:2022-10-05 發(fā)布人:
活動板房的鋼骨架的安裝搭建事項是怎樣的呢?制定好的搭設(shè)方案,由濟(jì)南活動板房廠家擔(dān)任安裝搭建,施工貴單位應(yīng)確認(rèn)廠家的搭設(shè)方案能否符合質(zhì)量需求,確定好位置,避開基坑邊、江河邊的松土地段,避開風(fēng)口和建造在迎風(fēng)方向。
What is the installation and erection of the steel skeleton of the prefabricated house? The established erection scheme shall be installed and erected by the manufacturer of movable plank houses in Jinan. The construction unit shall confirm whether the manufacturer's erection scheme can meet the quality requirements, determine the location, avoid the loose soil section near the foundation pit and the river, avoid the air outlet and build in the windward direction.
活動板房的鋼骨架的安裝搭建在基礎(chǔ)做好后,一步驟就是板房鋼骨架的安裝搭建,他這個主體搭建后集u需要加裝樓梯,我我們也知道我們的活動板房材料進(jìn)場安裝,一個步驟就是活動房鋼骨架的安裝搭建了。
After the foundation is completed, the installation and erection of the steel skeleton of the prefabricated house is the first step. After the construction of the main body, it is necessary to install stairs. I also know that the materials of our prefabricated house are mobilized for installation. One step is the installation and erection of the steel skeleton of the prefabricated house.
活動板房廠家搭建鋼骨架主體之后,就需要安裝樓梯了,我們知道常見樓梯是安裝在左右山墻的,安裝樓梯的同時,我們需要安裝活動板房走道板,這里只有二層三層的活動板房才需要安裝走道板的。
After the main body of the steel skeleton is built by the prefabricated house manufacturer, it is necessary to install the stairs. We know that common stairs are installed on the left and right gable walls. When installing the stairs, we need to install the walkway board of the prefabricated house. Here, only the prefabricated houses with two or three floors need to install the walkway board.
活動板房要求基礎(chǔ)平針,一步就是鋪地梁,鋪起來平整,保證水平,基礎(chǔ)好是平板)砼基礎(chǔ),或者條形基礎(chǔ),鋼骨架完成之后,就會如果是2-3層的活動板房就需要安裝樓承模板。
The movable plank house requires a flat foundation. The first step is to pave the ground beam, which is flat to ensure the level. The foundation is a slab) concrete foundation or a strip foundation. After the completion of the steel skeleton, if the movable plank house is of 2-3 floors, it will need to install the floor bearing formwork.
濟(jì)南活動板房
活動板房的屋面瓦開始安裝收,也可以給安裝隔墻板的墻面板了,并和板房門窗進(jìn)行調(diào)整,我們就會根據(jù)活動板房的層數(shù)來看是否安裝預(yù)制木板了,兩層的活動板房和三層的活動板房才需要安裝樓承木板的。
The roof tiles of the movable plank house have started to be installed. The wall panels of partition boards can also be installed and adjusted with the doors and windows of the movable plank house. We will see whether the prefabricated plank is installed according to the number of floors of the movable plank house. Only the movable plank house with two floors and the movable plank house with three floors need to install the floor bearing plank.
活動板房的屋面瓦開始安裝了,在安裝這個的同時,我們可以進(jìn)行室內(nèi)的隔墻彩鋼板安裝,和門窗等配件調(diào)試了?;顒影宸夸摴羌芎蜆浅邪灏惭b完成后,我們就需要開始安裝我們的彩鋼板了,在安裝彩鋼板的同時,我們也需要安裝門窗等配件活動板房材料了。
The roof tiles of the prefabricated house have been installed. While installing this, we can install the color steel plate of the indoor partition and debug the accessories such as doors and windows. After the installation of steel skeleton and floor bearing plate of prefabricated house, we need to start to install our color steel plate. While installing the color steel plate, we also need to install accessories such as doors and windows.
我們都知道板房主要的鋼骨架搭建好之后,它的材料就要依序進(jìn)行安裝,由于活動板房為鋼木結(jié)構(gòu),其安裝特點就在于裝配型房屋可隨意拆裝,便于運輸移動,穩(wěn)定性耐久性強(qiáng),外表美觀大方。您有什么需求就來我們網(wǎng)站http://www.fptdc.cn咨詢吧!
We all know that after the main steel skeleton of the plank house is built, its materials will be installed in order. Because the movable plank house is a steel wood structure, its installation feature is that the prefabricated house can be disassembled at will, convenient for transportation and movement, strong stability and durability, and beautiful appearance. Come to our website if you have any needs http://www.fptdc.cn Consult!