彩鋼板活動(dòng)房作為一種拆裝都十分快捷便利的建筑物。不僅實(shí)用性非常強(qiáng)大,更加具備了。下面我們就來(lái)說(shuō)說(shuō)濟(jì)南彩鋼板房拆除之前的基本構(gòu)思吧。
Color steel plate activity room is a very fast and convenient building for disassembly and assembly. It is not only very practical, but also environmentally friendly and energy-saving. Now let's talk about the basic idea before the demolition of Jinan color steel plank house.
拆除前的準(zhǔn)備工作:檢查腳手架的扣件連接、連墻件、支撐體系是否符合構(gòu)造要求;根據(jù)檢查結(jié)果補(bǔ)充完善施工方案中的拆除順序和措施,經(jīng)主管部門(mén)批準(zhǔn)后實(shí)施;由工程施工負(fù)責(zé)人進(jìn)行拆除技術(shù)交底;腳手架上雜物及地面障礙物。
Preparations before demolition: comprehensively check whether the fastener connection, wall connecting parts and support system of the scaffold meet the structural requirements; The demolition sequence and measures in the construction scheme shall be supplemented and improved according to the inspection results, and shall be implemented after being approved by the competent department; The person in charge of project construction shall carry out the technical disclosure of demolition safety; Remove the sundries and ground obstacles on the scaffold.
拆除時(shí)應(yīng)做到:拆除作業(yè)須由上而下逐層進(jìn)行,嚴(yán)禁上下同時(shí)作業(yè);連墻件須隨腳手架逐層拆除,嚴(yán)禁先將連墻件整層或數(shù)層拆除后再拆腳手架,分段拆除高差不應(yīng)大于2步。
During the demolition, it shall be ensured that: the demolition work shall be carried out layer by layer from top to bottom, and simultaneous operation from top to bottom is strictly prohibited; The wall connecting pieces must be removed layer by layer along with the scaffold. It is strictly forbidden to remove the whole layer or several layers of wall connecting pieces before removing the scaffold. The height difference of subsection removal shall not be greater than 2 steps.
如大于2步應(yīng)增設(shè)連墻件加固;當(dāng)腳手架拆下部后一根長(zhǎng)立桿的高度時(shí),應(yīng)先在適當(dāng)位置搭設(shè)臨時(shí)拋撐加固后,再拆除連墻件;當(dāng)腳手架分段、分立面拆除時(shí),對(duì)不拆除的腳手架兩端,應(yīng)按照規(guī)范要求設(shè)置連墻件和橫向斜撐加固;各構(gòu)配件嚴(yán)禁拋擲地面。
If it is more than 2 steps, it shall be strengthened by adding connecting pieces to the wall; When the scaffold is dismantled to the height of the next long vertical pole at the lower part, the temporary bracing shall be erected at the appropriate position for reinforcement, and then the fasteners to the wall shall be dismantled; When the scaffold is dismantled by sections and sections, the two ends of the scaffold that will not be dismantled shall be reinforced by wall connecting pieces and transverse diagonal braces according to the specification requirements; All components and fittings shall not be thrown to the ground.
濟(jì)南彩鋼板房
以下是彩鋼板房拆除方法:
The following is the demolition method of color steel plate house:
1.拆除工作開(kāi)始前,應(yīng)將電線、天然氣管道等通往被拆除建筑物的支線切斷或遷移。
1. Before the demolition, the branch lines leading to the demolished buildings such as electric wires and natural gas pipelines shall be cut off or relocated.
2.拆除建筑物前,應(yīng)在周?chē)O(shè)欄桿,禁止其他人員入內(nèi)。
2. Before the demolition of buildings, safety railings shall be set around to prevent other people from entering.
3.拆除建筑物,應(yīng)遵守拆除方案,自上而下進(jìn)行,禁止數(shù)層同時(shí)拆除。拆除作業(yè)人員,應(yīng)站在腳手架或穩(wěn)固的結(jié)構(gòu)上操作,拆除某部分時(shí),要防止其他部分發(fā)生坍塌,拆除梁、柱前應(yīng)先拆除其承重的全部結(jié)構(gòu)后進(jìn)行。
3. Demolition of buildings shall be carried out from top to bottom in accordance with the demolition plan. It is prohibited to demolish several floors at the same time. Demolition operators shall stand on scaffolds or stable structures. When removing a part, other parts shall be prevented from collapsing. Before removing beams and columns, all the structures bearing the load shall be removed first.
4.拆除前應(yīng)將有倒塌危險(xiǎn)的結(jié)構(gòu)物,用支柱等臨時(shí)加固。
4. Before demolition, the structures with danger of collapse shall be temporarily reinforced with pillars.
5.拆除建筑物時(shí),樓板上不準(zhǔn)多人聚集和集中堆放材料,拆除較大或較重的材料。
5. When demolishing buildings, it is not allowed to gather more people and stack materials in a centralized manner on the floor. Large or heavy materials shall be demolished.
按正確的順序全部拆除后,把所有彩板房材料清理出工地,重建的活動(dòng)房材料須重新進(jìn)場(chǎng),且須經(jīng)過(guò)層層驗(yàn)收和把關(guān)后方可使用。更多相關(guān)事項(xiàng)就來(lái)我們網(wǎng)站http://www.fptdc.cn進(jìn)行咨詢(xún)吧!
After all the materials of the color board room are removed in the correct order, all the materials of the color board room shall be removed from the construction site, and the materials of the rebuilt movable room must be re mobilized, and can only be used after being checked and accepted layer by layer. Come to our website for more information http://www.fptdc.cn Consult!