當(dāng)前位置:首頁(yè)>新聞資訊>新聞動(dòng)態(tài)工程板房的基礎(chǔ)到底怎么做才標(biāo)準(zhǔn)?

工程板房的基礎(chǔ)到底怎么做才標(biāo)準(zhǔn)?

來(lái)源:http://www.fptdc.cn 日期:2022-12-30 發(fā)布人:
濟(jì)南工程板房的基礎(chǔ)與任何建筑一樣,基礎(chǔ)決定上層建筑,符合標(biāo)準(zhǔn)的基礎(chǔ)能夠保證板房使用期間的性和舒適度。因此,臨建板房的基礎(chǔ)一定要符合板房的標(biāo)準(zhǔn)。
The foundation of the engineering plank house is the same as any building. The foundation determines the superstructure. The standard foundation can ensure the safety and comfort of the plank house during its use. Therefore, the foundation of temporary plank house must conform to the standard of plank house.
板房(T型板房)要求條型基礎(chǔ)400*400mm,且同時(shí)須要做好地坪,地坪和基礎(chǔ)一樣水平,即為平板基礎(chǔ);而標(biāo)準(zhǔn)板房(K型板房)只要先做好條型基礎(chǔ)300*300mm就可以安裝板房了
The plank house (T-shaped plank house) requires a strip foundation of 400 * 400mm, and at the same time, the floor must be well prepared. The floor is the same level as the foundation, that is, the slab foundation; The standard plank house (K-type plank house) can be installed as long as the strip foundation of 300 * 300mm is completed first
根據(jù)場(chǎng)地條件和條型基礎(chǔ)圖紙,釘好基礎(chǔ)模板,再用普通混凝土澆灌,并保持基礎(chǔ)面水平,如果場(chǎng)地為回填土,則需夯實(shí)和鋪墊層,并視場(chǎng)地情況可放幾根鋼筋,以保證基礎(chǔ)整體在板房使用期間不會(huì)下沉。
According to the site conditions and strip foundation drawings, the foundation formwork shall be nailed first, then ordinary concrete shall be used for pouring, and the foundation surface shall be kept horizontal. If the site is backfilled, it shall be tamped and paved, and several reinforcements can be placed according to the site conditions to ensure that the foundation will not sink during the use of the plank house as a whole.
濟(jì)南工程板房
安裝K房后,再做室內(nèi)地坪,這樣可憑隔墻板底端和地梁確定地坪的厚度,只要地坪比地梁高,雨水就不會(huì)滲進(jìn)板房室內(nèi),如果安裝K房提供平板基礎(chǔ)就有可能雨水倒流,導(dǎo)致室內(nèi)漏水。
After the installation of room K, the indoor floor shall be made, so that the thickness of the floor can be determined by the bottom of the partition board and the floor beam. As long as the floor is higher than the floor beam, the rainwater will not penetrate into the room. If the installation of room K provides a flat foundation, the rainwater may flow back, causing indoor water leakage.
注意,安裝板房須要做條型基礎(chǔ)400*400mm,并且同時(shí)要做好地坪;若不同時(shí)做好地坪,會(huì)影響板房的安裝質(zhì)量,所以板房的安裝基礎(chǔ)要求,須是基礎(chǔ)和地坪同時(shí)做好。
Note that the strip foundation 400 * 400mm shall be made for the installation of plank house, and the floor shall be prepared at the same time; If the floor is not prepared at the same time, the installation quality of the plank house will be affected. Therefore, the installation foundation of the plank house must be prepared at the same time with the floor.
工程板房的基礎(chǔ)到底怎么做才標(biāo)準(zhǔn)?以上所講解的內(nèi)容您可以作為參考使用,更多相關(guān)事項(xiàng)就來(lái)我們的網(wǎng)站http://www.fptdc.cn咨詢吧!
What is the standard for the foundation of engineering plank house? The above contents can be used as reference, and more related matters can be found on our website http://www.fptdc.cn Consult!